Piles with elastic fixing

Analysis of piles with a support by a torsion spring

In version 3.8 of the program DC-Pile it is possible to define a fixing by a torsion spring with a spring constant in kNm for the pile head and the pile foot.

This way the elastic fixing of the pile head in a ground slab ot the pile foot by a foot enlargement may be considered for the calculation of the section forces.