DC-Pit version 7.50

Verification of the grouted anchor body and automatic earth pressure redistribution

DC-Pit version 7.50 supports the following new functions:

  • In the design option, the design of the grouted anchor body is available, alternatively acc. to the diagrams by Ostermayer or with predefinition of a skin friction per soil layer
  • Automatic selection of the earth pressure redistribution figures acc. to EAB or EAU, depending on the wall type, excavation depth, number and depth of anchors
  • Anchor design incl. anchor failure acc. to EB 86, in addition to suitability load test and acceptance test
  • The ratio for the earth pressure redistribution into 2 or 3 rectangles is possible acc. to EAB definition (1.50:1).